Skip to content
VELOCITY SPRINT

Take one important thing from backlog to production.

4–6 weeks · One production-ready slice · Senior pod · Your repo, your cloud · Fixed fee, from $25,000

The problem

The bottleneck moved.

In short

The constraint has moved from writing code to making the right decisions, verifying changes, and getting them into production.

AI has reduced the effort required to produce code. It hasn't removed the engineering work required to release reliable software.

What changed for AI users, across 10,000+ developers

What changed for AI users, across 10,000+ developers
MeasureValue
Tasks completed+21%
PRs merged+98%
PR review time+91%
PR size+154%
Bugs per developer+9%

Higher is worse for the last three.

Source: Faros AI, 2025, via Rob Bowley

Speed with AI: what 16 experienced developers believed, and what was measured

Speed with AI: what 16 experienced developers believed, and what was measured
MeasureValue
Believed+20%
Measured−19%

METR’s Feb 2026 follow-up points the other way, on what METR calls weak evidence. The point stands either way: typing speed was never the constraint.

Source: METR, 2025

The engagement

Velocity Sprint in brief.

  • 01 · Defined delivery

    One important product feature. One agreed scope. We select a feature with clear business value, define acceptance criteria, and agree on what production-ready means before implementation begins.

  • 02 · Senior execution

    A senior Embedded Pod owns the work. A pod lead directs architecture and technical decisions. Engineers implement, verify, and prepare the feature for release.

  • 03 · Clear economics

    Fixed scope. Agreed price. Your code. You know what is included, what is excluded, and what acceptance means before work begins. The resulting software and agreed engineering assets belong to you.

AI-assisted delivery

The tool changed. The system didn't.

In short

AI accelerates execution. Engineering controls determine what gets released.

AI changes how quickly engineering work can be produced. It doesn't replace specification, technical judgment, verification, or production controls.

  • What AI does

    AI-assisted execution.

    1. Requirement breakdown
    2. Code generation
    3. Test generation
    4. Documentation
    5. Implementation assistance
  • What engineers do

    Engineering judgment.

    1. Review architecture
    2. Approve specifications
    3. Evaluate alternatives
    4. Review generated changes
    5. Own technical decisions
  • What the system enforces

    Delivery controls.

    1. Repository readinessGATE
    2. Approved specificationGATE
    3. Approved implementation planGATE
    4. VerificationGATE
    5. Production readinessGATE
    6. Release and measurementGATE
  • GATE A check that must pass before work moves on.
The six gates
Verification

Every change passes six gates before it counts.

In short

Nothing goes live until a named engineer has read it and the tests pass. Each gate leaves a record you can open.

AI can produce a change quickly. That doesn't make it ready for production. Every change must meet defined acceptance and verification criteria before release.

  1. GATE 0

    Repo-ready

    Correct repository, access, tooling, and environment.

    Record: checklist committed in docs/agent-readiness.md

  2. GATE 1

    Spec approved

    Requirements and acceptance criteria agreed.

    Record: the spec, its approval in the tracker, and the size class locked

  3. GATE 2

    Plan approved

    Implementation approach and technical decisions reviewed.

    Record: plan.md and tasks.md

  4. GATE 3

    Verified

    Automated tests, evaluations, and relevant security checks completed.

    Record: tracker status Verified, with its timestamp

  5. GATE 4

    Production-ready

    Deployment, operational readiness, and release requirements satisfied.

    Record: release checklist in the PR or release ticket

  6. GATE 5

    Released & measured

    Change released and production performance measured.

    Record: ledger row; tracker status Released

A gate that always passes isn't a gate. A change that fails verification returns for correction. It does not silently move forward.

Quality controls

Nothing gets released unverified. Here's what that means.

Production readiness is defined before implementation. A named engineer reviews the changes, automated checks provide evidence, and unresolved findings remain visible. Nothing is considered complete merely because the code runs.

  1. Human engineering review.

    A named engineer reviews technical decisions and generated changes against the agreed specification.

  2. Automated verification.

    Tests and evaluation suites check expected behavior before a change is accepted.

  3. Workload-specific controls.

    Security and operational checks reflect the requirements of the application. Controls are defined for the workload, not copied from a generic checklist.

The outcome

What changes for you

Commercial transparency

Know your own numbers first.

In short

This works out what a feature cost you last quarter. If you have no engineering team yet, skip it; the Production Readiness Review gives you a starting point.

The Sprint starts with an agreed scope, baseline, and acceptance criteria. You see the delivery economics before implementation begins.

How big is a typical feature?

M · a new screen or report

A size sets the features, the days, and the PRs per feature below. You can still move any knob.

How long a PR waits for review

About 24 hours, the median

Released features changed again

About 1 in 7, within 30 days of release

Cost per released feature
$15,000
Team cost for the quarter ÷ features released
Cycle time
21 days
Median, accepted → live
Review wait a quarter
2,304 hours
96 PRs × 24 hours each
Rework rate
15%
About 4 of 24 features changed again

Last quarter, a team of 8 cost $360,000 and released 24 features. Each one cost $15,000 and took 21 days from accepted to live, and 4 came back within 30 days. Review wait comes to 2,304 hours a quarter, and the rework rate is 15%.

Use your exact numbers

From your tracker and git, last quarter. Anything you type replaces the knob above it; leave a field blank to keep the knob.

In US dollars

Illustrative until you enter your own · your numbers only

Assumes 4 PRs per released feature. Cost per released feature = engineers × monthly cost × 3 months ÷ features released. Review wait a quarter ≈ median wait × PRs merged. Rework rate = changed within 30 days ÷ released.

The scope defines the price. Changes to scope are discussed and agreed before additional work begins.

Bring these to the call
The process

How it runs

  1. WEEK 0

    Scope.

    One feature. Clearly bounded. Define the feature, dependencies, acceptance criteria, and production requirements in writing.

    Artifact: Signed scope
  2. WEEK 1

    Baseline.

    Your starting point. Your numbers. Agree on delivery expectations, current performance, and the measures used to evaluate the result.

    Artifact: Baseline sign-off
  3. 2–4 WEEKS

    Build.

    Senior pod. AI-assisted delivery. The Embedded Pod implements the feature, reviews changes, and verifies progress against the approved specification.

    Artifact: Working releases in staging
  4. LAST WEEK

    Read-out.

    Working software. Measured delivery. Review the released feature, delivery evidence, and remaining recommendations. Decide whether further work makes sense.

    Artifact: Production software and the read-out

4–6 weeks from kickoff. Week 0 is scoping, before the clock starts; the build runs 2–4 weeks, set by the slice.

Commercial model

Clear scope. Clear price. No surprises.

One agreed price for the defined scope. You review the deliverables, exclusions, and acceptance criteria before work begins.

  1. One agreed price.

    A fixed price for the agreed feature and scope. Any change to the scope is discussed before additional work begins.

  2. No lock-in.

    Nothing here ties you to an ongoing engagement. Further work is a separate decision.

  3. You keep it all.

    The software, code, and agreed engineering assets created through the engagement belong to you, subject to the contract.

Choose your engagement

Three ways in.

Start with clarity. Prove delivery. Scale what works.